Build visibility | Share expertise | Strengthen authority

  • Style meets Safety - dentec Leaderboard
  • Keith - Leaderboard - March 2026
  • Cooper Equipment Rentals - Leaderboard
  • Leaderboard - Toronto Summit 2026 - Building Transformations
  • CMiC Leaderboard - September 2026
Nisku Fab Shop - PCL Construction
September 8, 2026

Forged Through Innovation: How PCL’s Fabrication Shop Became an Industry Titan

For nearly 70 years, PCL’s industrial fabrication shop has grown, integrated new technology and refined its processes, while remaining committed to being Canada’s most trusted industrial builder.


The familiar smell of freshly cut metal and the high-pitched buzz of angle grinders greet Gary Trigg as he steps onto the floor of PCL’s pipe fabrication facility in Nisku, Alberta — a place he led for nearly three decades.

“It brings back lots of memories every time I come back here,” he says, as he takes in the busy shop space. “I always love coming back.”

Trigg wasn’t the kind of boss who spent all his time in an office. Even a decade after retiring, he’s comfortable on the floor — and is greeted warmly by workers who have been here long enough to remember him.

“Hey! Good to see you,” says Geoff Paul.

“Family’s good?” Trigg asks former coworker Greg Cooper.

For Trigg, the facility will always feel like home, even as he marvels over the changes since he left.

“I mean, you look at how the place has grown over the years and it’s amazing,” he says. “The evolution is incredible.”

The 145,000-square-foot shop is currently run by Kim Heit and Pedro Mendes, who both started here in the 1990s under Trigg’s leadership.

Keep reading this article on PCL.com


Explore related articles you won’t want to miss:

PCL Strengthens Edmonton Leadership with Ryan Kuntz Appointment

PCL Construction Names Ben Wagemakers Saskatoon District Manager

  • Keith - Box - March 2026
  • CSA First Aid Kits - Dentec - Box