Tuesday, September 24, 2024
  • Procore Leaderboard 2024
  • Keith Walking Floor - Leaderboard - Sept 2021
  • Sage Leaderboard
  • Revizto - Leaderboard - September and October 2024
  • Premier Construction Software - Leaderboard New - Sept 5
  • IAPMO R&T Lab - Leaderboard
  • NIBS - Digital Twins 2024
  • Canadian Concrete Expo 2025 - Leaderboard
  • Dentec - Leaderboard - 2023 - Updated
  • CWRE 2024
August 2, 2019

Scotiabank Arena in Toronto is getting a makeover

As blogged on blogTO.com, Scotiabank Arena is changing, again, but this time it’s physical. The building is getting a multimillion-dollar renovation.

The revamps Maple Leafs Sports and Entertainment has planned will enhance the current building, which originally opened in 1999, and improve the tech side of the business.

Advertise YOUR business on Construction Links Network – Download the media kit

After Jurassic Park reached maximum capacity every night of the NBA championship series, a bigger screen became a priority for fans struggling in the back of the crowd.

The new screen is going to be 40 per cent bigger than the already massive 9.1 by 15.5 metre one, according to Sportsnet. A construction crane is already perched outside of the arena and prepared to set it up.

An extra screen will also be set up on the west side of the building to accommodate viewing multiple sports games at the same time.

Keep reading on blogTO.com