Saturday, May 4, 2024
  • Revizto - Leaderboard - May and June 2024
  • Keith Walking Floor - Leaderboard - Sept 2021
  • IAPMO R&T Lab - Leaderboard
  • Premier Leaderboard - updated Nov 19
  • Dentec - Leaderboard - 2023 - Updated
  • CWRE 2024
  • Procore Leaderboard 2024
evaculated Edmonton condo
March 25, 2024

Overstressed Building: City of Edmonton Examines Castledowns Pointe’s Design

An investigation by the City of Edmonton revealed that the construction of Castledowns Pointe, a condo building evacuated due to structural issues, did not match the original design drawings. This finding aligns with an earlier engineer’s report indicating the building was overstressed and not built to code. Recommendations include better regulation of roles under the Safety Codes Act and improving public safety measures. Despite multiple inspections during construction, no problems were documented, raising questions about oversight responsibilities. The incident underscores the need for enhanced construction accountability and stakeholder education.

Read the article on CBC News


Check out more news and blogs here

  • Keith Walking Floor - Box - Sept 2021
  • Procore Box 2024