Thursday, May 2, 2024
  • Revizto - Leaderboard - May and June 2024
  • Premier Leaderboard - updated Nov 19
  • Procore Leaderboard 2024
  • IAPMO R&T Lab - Leaderboard
  • Dentec - Leaderboard - 2023 - Updated
  • Keith Walking Floor - Leaderboard - Sept 2021
  • CWRE 2024 - Leaderboard
Jonas Enterprise - logo for webinar
October 18, 2022

Join us on November 3: Masterclass – Construction Billing Methods & Best Practices: T&M & Cost-Plus

Every construction project is unique and comes with its own set of challenges and requirements. The long-term duration of jobs coupled with the challenge of establishing a firm estimate can make billing complicated. Because of this, choosing the proper billing styles and practices is essential to ensure that you get paid accurately and on time.

Two of the more flexible contract types are Time and Materials (T&M) and Cost-Plus. When the scope of work or duration of a project is difficult to determine, T&M and Cost-Plus billing can help reduce risks and ensure your costs are covered, while also ensuring that you’re making a profit.

Whether you’re using Cost-Plus or T&M billing, Jonas Construction Software has you covered. Our software is designed to help construction and service companies streamline their billing process.

In the next installment of the Jonas Masterclass series, we’ll be discussing how these contract types differ as well as the pros and cons of each.

Join us on Thursday, November 3rd, for a detailed overview of T&M and Cost-Plus contracts, and how Jonas enables you to easily track, create, and manage your billings.

What will be covered:

-The difference between T&M and Cost-Plus contracts
-The pros and cons of T&M and Cost-Plus billing
-Creating, tracking, and managing job billings in Jonas
-Best practices and workflows

November 3, 2022 12:00 PM in Eastern Time (US and Canada)


  • Chicago Build 2024 - Box
  • Dentec Winter Catalog Box