A construction project begins in early spring. Excavation starts, the site is stripped and graded, and then the weather changes. Temperatures rise, snow melts, rain moves in – and water starts to build. Without any planned drainage, runoff flows directly into the excavated area, flooding the jobsite.
It’s a familiar flood season scenario on spring jobsites. What starts as manageable water can lead to delays and added costs. Without the right equipment – and a partner who can get machines up and running quickly – even the best laid plans can fall short.
In practice, flood management comes down to a few things you need to get right early.
Keep reading the article on cooperequipment.ca