Wednesday, April 24, 2024
  • Procore Leaderboard 2024
  • IAPMO R&T Lab - Leaderboard
  • Keith Walking Floor - Leaderboard - Sept 2021
  • Dentec - Leaderboard - 2023 - Updated
  • CWRE 2024 - Leaderboard
  • Revizto - Leaderboard - March and April
  • Premier Leaderboard - updated Nov 19
PCL Construction wins contract to replace bridges
January 11, 2021

Contract awarded to build South Bow River Bridge in Calgary

PCL Construction has won the contract to replace the eastbound bridge over the Bow River on southeast Stoney Trail in Calgary.

The contract was awarded for about $48 million and offers significant savings for taxpayers. The total project cost, which includes engineering and utility relocations, is estimated at $60 million – significantly less than the anticipated cost of $70 million.

“With the next step in this strategic project complete, we are creating hundreds of jobs to drive Alberta’s recovery and saving taxpayer dollars at a time of fiscal restraint. Calgarians can look forward to safer and faster rides on an even more complete Calgary Ring Road.”

Ric McIver, Minister of Transportation

“New and widened bridges are great news for south Calgary residents who have been waiting for safer ways to get to work and play. Alberta’s government is focused on strategic projects that deliver value and jobs when they’re needed most.”

Richard Gotfried, MLA for Calgary-Fish Creek

“PCL is excited to work with Alberta Transportation on this component of the Stoney Trail Calgary Ring Road, a key project to connect Calgarians. Once complete, this segment will be safer for vehicles, cyclists and pedestrians.”

Ankur Talwar, manager, Civil Operations, PCL Calgary

The South Bow River Bridge project also includes widening the westbound bridge and building a new, stand-alone pedestrian bridge.

Construction on the new bridge is anticipated to get underway in spring 2021 and be completed in late 2023.

Alberta’s Recovery Plan is a bold, ambitious long-term strategy to build, diversify, and create tens of thousands of jobs now. By building schools, roads and other core infrastructure we are benefiting our communities. By diversifying our economy and attracting investment with Canada’s most competitive tax environment, we are putting Alberta on a path for a generation of growth.

Quick facts

  • More than 53,000 vehicles travel over the bridge daily.
  • This number is expected to increase when the Calgary Ring Road is completed. 
  • The South Bow Bridge project will support about 244 jobs.
  • The project includes:
    • Widening the existing westbound bridge to add a fourth lane.
    • Replacing the existing eastbound Stoney Trail bridge with a new, wider bridge over the Bow River.
    • A new pedestrian bridge south of the existing bridge that will connect to the existing pathway networks.
    • Improvements to interchanges between Sun Valley Boulevard/Chaparral Boulevard and Cranston Boulevard /Mckenzie Lake Boulevard.